Acreage: 28.3
Project Scope: Construction of a new High School, CTE & Maintenance Building, and Grandstands
  • Demolition
  • 189,400 gross square feet of building prep
  • 335,000 square feet of asphalt parking lot
  • 99,000 square feet concrete sidewalk, drivable concrete, and approaches
  • 9,333 lineal feet of curb
  • Import and place over 50,000 ton of gravel
  • Install over 10,000 lineal feet of pipe ranging in size from 1 ½” poly to 18” Storm and 18” RCP

Add-ons awarded in conjunction with this project:

  • Widening of MT US HWY 87 E
  • Lockwood High School Softball Field