Acreage: 5.58

Cayton Excavation, Inc. was heavily involved with the design and value engineering of this project. We also managed installation of the synthetic turf field and rubber track.

  • Demolition of existing grass football field and gravel track.
  • 8700 Cubic yards of cut/fill and export
  • 57,500 square foot of track prep and installation
  • 80,542 square feet of field prep and synthetic turf installation
  • 3,248 lineal feet of concrete curb
  • 3.850 lineal feet of storm drain installation
  • Field event installation including long jump, pole vault, shot put, and discus